A newly installed architectural shingle roof on a contemporary home at blue hour

Roof Replacement

A full tear-off to the deck, every component replaced, and a complete system installed to the manufacturer’s specification.

Full tear-off roof replacement — deck inspection, ice-and-water, synthetic underlayment, new flashings, ridge ventilation, and a complete shingle system.

  • Veteran-owned
  • Five-state service
  • Free inspection

Roof Replacement, clearly scoped.

A roof replacement is not a shingle purchase. It is the one opportunity you get to see the deck, correct what is wrong underneath, and rebuild every layer that keeps water out. What separates a twenty-five-year roof from a twelve-year roof is almost never the shingle — it is the underlayment, the flashings, and the ventilation.

01SCOPE MODULE

How to tell replacement beats repair

  • Granule loss across the field. Granules are the shingle’s UV shield. Bald patches, and a steady accumulation of granules in the gutters and at the downspout outlets, mean the asphalt underneath is now aging in direct sunlight.
  • Exposed mat. Once you can see the black fiberglass mat through the surface, that area of shingle is finished. It will curl, crack, and shed.
  • Multiple leaks in unrelated places. One leak is a failed component. Leaks at the chimney, a valley, and a pipe boot in the same season is a roof telling you its whole generation of flashings and boots has aged out together.
  • Age against material life. Three-tab shingles generally run about twenty to twenty-five years and architectural laminates about twenty-five to thirty in a mild climate — and hail country plus 100-degree summers shortens both. A roof at the end of that window is spending money, not saving it.
  • Widespread hail bruising. Bruising scattered across several slopes cannot be spot-repaired, because the fractures are in the mat everywhere the stones landed.
  • Brittleness. If shingles crack when they are lifted rather than flexing, the roof can no longer be worked on without damaging it further.
  • Sagging or spongy decking. A deck that gives underfoot means the sheathing has taken on moisture, and that is only fixable with the shingles off.
02SCOPE MODULE

What a full tear-off actually includes

  • Tear-off to the deck. Every layer comes off — shingles, underlayment, old flashings, and old drip edge — so nothing failed is left buried.
  • Deck inspection and sheathing replacement. With the deck exposed, rotted, delaminated, or water-damaged sheathing gets cut out and replaced, and inadequate fastening gets corrected.
  • Ice-and-water shield at eaves and valleys. A self-adhering membrane that seals around fasteners, placed where water backs up or concentrates — the eaves, the valleys, and around penetrations.
  • Synthetic underlayment over the field. Synthetic sheets are stronger, lighter, and far more tear-resistant than felt, and they hold up better if weather arrives before the roof is loaded.
  • Starter course at eaves and rakes. A purpose-made starter strip puts adhesive exactly where the first course needs it and seals the rake edge, which is where wind gets its first grip on a roof.
  • Drip edge. Metal at the eave and rake that carries water off the deck edge and into the gutter instead of behind the fascia. It is code, and it is routinely omitted on cheap roofs.
  • New flashings throughout. New pipe boots, new step flashing at every wall, new counterflashing, new valley metal, and kickout flashing where a roof edge dies into a wall above a gutter.
  • Balanced ridge ventilation. Continuous ridge exhaust matched to adequate soffit intake, so the attic actually moves air.
  • Ridge cap. Purpose-made hip and ridge cap, not field shingles cut down, so the most wind-exposed line on the roof is covered with material rated for it.
03SCOPE MODULE

Why a layover is a bad idea

Installing a second layer of shingles over the first is cheaper on the day and expensive for the rest of the roof’s life. It hides the deck, so rot, delamination, and bad fastening go unseen and unfixed. It doubles the dead load on framing that was designed for one layer. The new shingles telegraph the ridges and irregularities of the old ones, so the roof looks lumpy within a season. It traps heat between the layers and cooks the new shingles from below, shortening their life. Flashings frequently get reused instead of replaced, which leaves the actual leak points untouched. And the eventual tear-off costs more because there are two layers to remove.

04SCOPE MODULE

Ventilation is part of the roof

Attic ventilation is not an accessory. It works as a pair: intake low at the soffits and exhaust high at the ridge, roughly balanced so air enters at the bottom and leaves at the top. Install ridge vent without adequate intake and the vent pulls conditioned air out of the house instead. Get it wrong and superheated attic air bakes the shingles from underneath and winter moisture condenses on the deck. Mixing vent types on one attic — ridge vent plus powered fans plus gable vents — can short-circuit the airflow so that the ridge vent becomes an intake.

05SCOPE MODULE

What install day looks like

Material is delivered ahead of or at the start of the day, and driveways, landscaping, HVAC condensers, and pool equipment are protected before anything comes off. Tear-off runs in sections so no part of the deck sits open longer than it needs to. Exposed sheathing is inspected and repaired as it appears, then dried in, then loaded and installed. At the end, the site gets swept and run with rolling magnets for nails — driveway, lawn, and beds — and the job is walked with you.

Most single-family replacements are a one-day or two-day job, though complexity, steep pitch, tile or slate, deck damage, and weather all move that. Weather is the honest variable: no reputable crew opens a deck into an incoming storm, so a firm start date sometimes moves by a day.

What roof replacement includes

Tear-off to the deck

Every old layer removed so the sheathing can be inspected and repaired before anything new goes down.

Deck repair included

Rotted or delaminated sheathing is cut out and replaced rather than covered over.

Complete water barrier

Ice-and-water at eaves and valleys, synthetic underlayment over the field, starter at eaves and rakes.

All new flashings

Pipe boots, step flashing, counterflashing, valley metal, drip edge, and kickouts replaced, not reused.

Balanced ventilation

Ridge exhaust matched to soffit intake so the attic moves air instead of cooking the new roof.

Certified system install

Installed to the manufacturer’s specification by a GAF Master Elite® certified contractor.

How CMAC handles roof replacement

  1. 1

    Free inspection and documentation

    Every slope, flashing, and penetration is inspected and photographed — drone imagery included — so the recommendation is based on evidence.

  2. 2

    System selection and written estimate

    You choose the shingle line, color, and ventilation approach, and get an itemized written scope covering materials and workmanship.

  3. 3

    Scheduling and staging

    Material is delivered and the site is protected — driveway, landscaping, and rooftop equipment — before tear-off begins.

  4. 4

    Tear-off and deck repair

    The roof comes off in sections, the sheathing is inspected as it is exposed, and damaged decking is replaced.

  5. 5

    Dry-in and installation

    Ice-and-water, underlayment, starter, drip edge, and flashings go down, then the field, then hip and ridge cap.

  6. 6

    Cleanup and walkthrough

    Debris hauled, magnet sweep for nails across drive and lawn, and a final walk of the finished roof with you.

Systems and manufacturers

  • GAFMaster Elite® certified — full shingle system
  • CertainTeedAsphalt shingle systems
  • AtlasAsphalt shingle systems
  • TAMKOAsphalt shingle systems

Roof Replacement questions

How do I know whether to repair or replace my roof?

Age relative to the material’s service life, how widespread the damage is, and whether you have had more than one leak are the deciding factors. Isolated damage on a roof with years of life left is a repair. Widespread granule loss, exposed mat, multiple leak points, or hail bruising across every slope generally means replacement, because patching a failing system just moves the next leak somewhere else. An inspection settles it.

How long does a roof replacement take?

Most residential asphalt shingle replacements are a one to two day job once materials are on site. Tile, slate, metal, and complex roof geometry take longer. Weather, decking replacement discovered after tear-off, and permit or HOA requirements are the usual reasons a schedule moves.

What does GAF Master Elite® mean?

GAF awards Master Elite® status to a small fraction of roofing contractors in North America. It requires proof of proper licensing, adequate insurance, and a sustained record of quality installations and customer satisfaction. Practically, it means CMAC can offer enhanced GAF system warranties that non-certified contractors cannot, and that GAF has independently vetted the company. CMAC is also a GAF President’s Club award winner.

Do you charge for an inspection or an estimate?

No. The inspection, the damage documentation including drone photography, and the written estimate are all free and carry no obligation. If the roof does not need work, we will tell you that.

Will CMAC work with my insurance company?

CMAC can document visible damage, provide a contractor report, and attend the carrier’s inspection to explain the proposed repair scope. CMAC is a contractor, not a public adjuster or law firm, and does not interpret policy coverage or represent a policyholder in a coverage dispute.

My roof looks fine from the ground. Could it still be damaged?

Frequently, yes. Hail bruises the mat underneath the granule surface, and that bruising is often invisible from the ground and sometimes hard to see from a ladder. It shortens the roof’s life and creates the leaks you will discover a year or two later, after your claim window has closed. That is why documented post-storm inspections matter.

Start with a free inspection.

Tell CMAC what is happening at the property. We will inspect the condition and put the recommended scope in writing.